Photovoltaics for industrial businesses in Upper Austria
Permanently reduce your energy costs by 30–60% — with your own solar power from your industrial roof.
Why photovoltaics for industrial businesses in Upper Austria?
Upper Austria is Austria's leading industrial region — and the federal state with the highest electricity cost per manufactured unit. Generating your own PV electricity on an industrial roof cuts your operating costs permanently by 30–60 % and removes your exposure to market price volatility.
Industrial load profiles align perfectly with solar generation: production happens during the day — and that is exactly when PV produces peak output. With proper sizing, self-consumption rates of 70–90 % are the rule, not the exception.
What eco-NG delivers
- Site assessment of roof and ground areas (structural review, shading, grid connection)
- Business case with payback period, IRR and CO₂ balance
- Subsidy optimisation — Austrian EAG, Upper Austria state grants, climate fund
- Engineering & design to ÖVE/ÖNORM E 8101 and IEC 61730
- Turnkey general contracting — one partner, one contract
- Integration with battery storage and EV charging infrastructure
- Monitoring, maintenance and recurring drone inspections
- Direct marketing and Power Purchase Agreement (PPA) models
Typical size & economics
Industrial PV systems typically range from 100 kWp to 5 MWp. At current industrial electricity prices (15–25 ct/kWh) and module costs, payback is reached in 5–9 years, against an operational lifetime of more than 25 years.
Example — 500 kWp industrial rooftop: approximately 500,000 kWh of self-consumption per year, equivalent to ~ € 100,000 in annual electricity cost savings.
References from Upper Austria
eco-NG has realised industrial rooftop systems including Ennshafen (3 MWp, 6,584 modules across 30,000 m² of roof). Further references are happy to share in a first call.
Complementary services: Drone thermography, battery storage integration.
Your next step
Send us the key parameters of your project — roof area, annual electricity consumption, target timeline. Within 5 working days you receive a first indication of investment, yield and payback.